Milestones

2019

  • Substantial Completion Certificate Obtained
    Development of Food Hub Complex at Senoko Drive/Senoko Loop

    09 January 2019

  • Temporary Occupation Permit (TOP) Acquired
    Relocation and Erection of the 2 Storey Recreational Building with Single Storey Buggy Shed, a Guard House/Bin Centre and a 22KV Sub-Station only (excluding Golf Driving Range)

    02 April 2019

  • Temporary Occupation Permit (TOP) Acquired
    Relocation and Erection of the 2 Storey Recreational Building with Single Storey Buggy Shed, a Guard House/Bin Centre and a 22KV Sub-Station and TOP for Driving Range Area, Maintenance Access Road to PES and Ball Retrieval Shed only

    03 May 2019

  • Secured LTA contract for Additional and Alteration Works to Rail Facility Building

    28 February 2019

  • Final Completion Certificate Obtained
    Building Works at Jurong West Neighbouhood 1 Contract 30 and Contingency Works

    01 March 2019

2018

  • Substantial Completion Certificate Obtained
    Development of Food Hub Complex at Senoko Drive/Senoko Loop

    09 January 2018

  • Secured LTA contract for Additional and Alteration Works to Rail Facility Building

    28 February 2018

  • Final Completion Certificate Obtained
    Building Works at Jurong West Neighbouhood 1 Contract 30 and Contingency Works

    01 March 2018

  • Temporary Occupation Permit (TOP) Acquired
    Relocation and Erection of the 2 Storey Recreational Building with Single Storey Buggy Shed, a Guard House/Bin Centre and a 22KV Sub-Station only (excluding Golf Driving Range)

    02 April 2018

  • Temporary Occupation Permit (TOP) Acquired
    Relocation and Erection of the 2 Storey Recreational Building with Single Storey Buggy Shed, a Guard House/Bin Centre and a 22KV Sub-Station and TOP for Driving Range Area, Maintenance Access Road to PES and Ball Retrieval Shed only

    03 May 2018

2017

  • Secured LTA contract for Relocation of Recreational Facility

    10 January 2017

  • Final Completion Certificate Obtained
    Improvement to Roadside Drains at Charlton Park Estate

    28 March 2017

  • Temporary Occupation Permit (TOP) Acquired
    Erection of a Food Hub Comprising a block of 7-storey multiple-user warehouse/facory building with ancillary facilities on Lots 01543X, 01545C and 01546M MK 13 at Senoko Drive

    07 July 2017

2016

  • Temporary Occupation Permit (TOP) Acquired
    Singapore Lee Clan General Association at Lot/s 97823A & 98776M T.S17 at 363 Jalan Besar Singapore 208994

    07 January 2016

  • Maintenance Certificate Obtained
    Biosensors Project

    27 January 2016

  • Maintenance Certificate Obtained
    A&A to Kian Ann Warehouse at No.7 Changi South Lane

    28 January 2016

  • Completion Certificate Obtained
    A&A to the existing conserved 4-storey building at 363 Jalan Besar

    11 March 2016

  • Final Completion Certificate Obtained
    A&A Works to Accommodation Buildings, Toilet and Mess at Upper Jurong Road

    31 August 2016

  • Final Completion Certificate Obtained
    Erection of a 3-Storey Operations Building at New Phoenix Park

    20 September 2016

  • Final Completion Certificate Obtained
    Erection of 8-Storey Warehouse Retail Complex at Jurong East Street 11

    23 September 2016

  • Secured LTA Upgrading work at Permanent Way and Locomotive Workshop in Tuas Depot

    11 November 2016

2015

  • Temporary Occupation Permit (TOP) Acquired
    LinkBridge at Level 2 and Sky Terraces at Level 3 at Lot 8359W MK05 Jurong East Street 11

    02 January 2015

  • Maintenance Certificate Obtained
    Lot 4182x & 4183L mk 06 at Corporation Road Blk 175

    26 February 2015

  • Jian Huang Joint Venture with Yongnam secured JTC Project for erection of a Food Hub Comprising A Block of 7-Storey Multiple-User Warehouse/Factory Building with ancillary facilities at Senoko Drive

    March 2015

  • Certificate of Statutory Completion (CSC) Obtained
    Biosensors Project

    05 October 2015

  • Maintenance Certificate Obtained
    Lot 17622A mk 18 at Serangoon North Ave 5

    28 October 2015

  • Maintenance Certificate Obtained
    Benoi Sector Project

    30 October 2015

2014

  • Temporary Occupation Permit (TOP) Acquired
    Lot 4182x & 4183L mk 06 at Corporation Road Blk 175

    29 January 2014

  • Temporary Occupation Permit (TOP) Acquired
    Lot 04584C mk 07 at Tuas South Street 8

    30 April 2014

  • Temporary Occupation Permit (TOP) Acquired
    Biosensors Project

    19 August 2014

  • Certificate of Statutory Completion (CSC) Obtained
    K&S Project

    13 October 2014

  • Certificate of Statutory Completion (CSC) Obtained
    Teck Leong Project

    29 October 2014

  • Certificate of Statutory Completion (CSC) Obtained
    Benoi Sector Project

    03 November 2014

  • Temporary Occupation Permit (TOP) Acquired
    Big Box Project

    11 November 2014

2013

  • Teck Leong Industries Pte Ltd awarded contract for erection of a Single-User 2-Storey Factory with building with Ancillary Office at Tuas South Street 8

    January 2013

  • Certificate of Statutory Completion (CSC) Obtained
    Lot 02456T MK 2 at 22 Jalan Kupang

    20 February 2013

  • Certificate of Statutory Completion (CSC) Obtained
    Gold Kili Project

    17 June 2013

  • Temporary Occupation Permit (TOP) Acquired
    HSL Project

    23 September 2013

  • Temporary Occupation Permit (TOP) Acquired
    K&S Project

    04 October 2013

  • Temporary Occupation Permit (TOP) Acquired
    Warehouse Building Project at Benoi Sector Project

    06 November 2013

2012

  • Achieve S1000 2012 Listing from DP Information Group

    January 2012

  • Mapletree Industrial Trust awarded contract for erection of a 5-storey Multi-user Industrial Building with Ancillary Offices at Serangoon North. The building will house the Singapore HQ of Kulicke Soffa, a US semiconductor equipment maker

    May 2012

  • Kian Ann Engineering Ltd awarded contract for addition and alteration of existing Part 3-Storey Part 5-Storey Single-User, Single Occupier Warehouse at Changi South Lane

    May 2012

  • Certificate of Statutory Completion (CSC) Obtained
    Suki Sushi Project

    May 2012

  • Temporary Occupation Permit (TOP) Acquired
    Suki Sushi Project

    11 May 2012

  • Temporary Occupation Permit (TOP) Acquired
    Hoya Project

    27 June 2012

  • Temporary Occupation Permit (TOP) Acquired
    XMH Project

    10 September 2012

  • Temporary Occupation Permit (TOP) Acquired
    Lot 02456T mk 27 at 22 Jalan Kupang

    12 October 2012

2011

  • Achieve S1000 2011 Listing from DP Information Group

    January 2011

  • HDB awarded contract for 465 dwelling units at Jurong West N1C30 - Corporation Tiara

    April 2011

  • HDB awarded contract for 465 dwelling units at Jurong West N1C30 - Corporation Tiara

    April 2011

  • Entered Sale-and-Leaseback Arrangement with Mapletree Logistics Trust For a warehouse cum office building located at 15A Tuas Avenue 18, Singapore (Jian Huang Business Centre)

    March 2011

  • Certificate of Statutory Completion (CSC) Obtained
    Lot 3931k mk 07 at 15A Tuas Ave 18

    02 March 2011

  • Defence Science Technology Agency awarded contract for New Buildings at Nee Soon Camp and Maju Camp

    April 2011

  • Temporary Occupation Permit (TOP) Acquired
    Suki Sushi Project

    27 May 2011

  • National Environment Agency awarded contract for the Upgrading of Existing Market/Food Centre at Blk 353 Clementi Ave 2, Blk 4A Eunos Crescent & Blk 4A Jalan Batu under the Hawker Centres Upgrading Programme (HUP) - Batch 7

    July 2011

  • JHC upgrade to BCA A1 CW01 General Building Contractor

    August 2011

  • Public Utilities Board awarded contract for Improvement to Roadside Drains at Charlton Park Estate

    August 2011

2010

  • Achieve S1000 2010 Listing from DP Information Group

    January 2010

  • Certificate of Statutory Completion (CSC) Obtained
    Teck-Link Project

    09 March 2010

  • Temporary Occupation Permit (TOP) Acquired
    I-Park Project

    10 March 2010

  • Certificate of Statutory Completion (CSC) Obtained
    Lot 02878m mk5 at 50 Cheng Soon Garden

    05 March 2010

  • JH Projects upgraded to BCA A2 CW01 General Building

    June 2010

  • Certificate of Statutory Completion (CSC) Obtained
    Lot 6683T mk 23 at 35 Tai Seng Street

    07 June 2010

2009

  • Certificate of Statutory Completion (CSC) Obtained
    Lot 4323l mk31 at Changi North Way

    29 January 2009

  • Certificate of Statutory Completion (CSC) Obtained
    Lot 6814 & 6821 at 11 Bedok North Ave/Upper Changi Road

    13 April 2009

  • Temporary Occupation Permit (TOP) Acquired
    Lot 3931k mk 7 at 15A Tuas Ave 18

    27 April 2009

  • Temporary Occupation Permit (TOP) Acquired
    Lot 02878m mk5 at 50, Cheng Soon Garden

    23 July 2009

  • Temporary Occupation Permit (TOP) Acquired
    Lot 03604x mk 7 at Tuas View Lane

    02 September 2009

  • First Pile for Suki Sushi Project

    November 2009

  • Certificate of Statutory Completion (CSC) Obtained
    Lot 4153c mk 6 at No.15 Pioneer Walk

    23 November 2009

2008

  • Achieve SME500 2008 Listing from DP Information Group

    January 2008

  • Temporary Occupation Permit (TOP) Acquired
    Lot 7948 mk5 at 46A Tanjong Penjuru Road

    January 2008

  • Temporary Occupation Permit (TOP) Acquired
    Lot 2901x & 2525A mk6 at Jurong Port Road

    01 February 2008

  • Temporary Occupation Permit (TOP) Acquired
    Lot 6130p mk23 at Ubi Road 3/ Ubi View

    04 April 2008

  • Wins Fastest Growing 50 2007 Award

    July 2008

  • Temporary Occupation Permit (TOP) Acquired
    Lot 4323l mk 31 Changi North Way (Phase 1)

    28 July 2008

  • Temporary Occupation Permit (TOP) Acquired
    Lot 4153c mk 6 at 15 Pioneer Walk (Phase 1)

    12 August 2008

  • Temporary Occupation Permit (TOP) Acquired
    Lot 4323l mk31 at 15 Changi North Way (Phase 2)

    03 September 2009

  • Temporary Occupation Permit (TOP) Acquired
    Lot 4153c mk 6 at 15 Pioneer Walk (Phase 2)

    10 October 2008

  • JHC, JHB and JHP, concurrently obtain ISO 9001:2000 certification

    November 2008

  • JHC, JHB and JHP, concurrently obtain ISO 14001:2004 certification

    November 2008

  • JHC, JHB and JHP, concurrently obtain OHSAS 18001:2007 certification

    November 2008

  • Signing Ceremony for first China Project

    November 2008

  • Obtain Business License for JH Capital (Kunming) Pte Ltd (JHCK)

    December 2008

  • Ground breaking ceremony for first China project

    December 2008

2007

  • Achieve SME500 2007 Listing from DP Information Group
    Position 473

    January 2007

  • Temporary Occupation Permit (TOP) Acquired
    Lot 4150 , 7482 mk5 at 38 Tanjong Penjuru Road

    10 January 2007

  • Temporary Occupation Permit (TOP) Acquired
    Lot 8136w mk5 at Penjuru Lane (Phase 2)

    10 April 2007

  • Temporary Occupation Permit (TOP) Acquired
    Lot 557 mk4 Namly Crescent

    09 May 2007

  • Temporary Occupation Permit (TOP) Acquired
    Lot 4097w mk6 at 2 Fishery Port Road

    13 June 2007

  • Temporary Occupation Permit (TOP) Acquired
    Lot 4097w mk6 at 2 Fishery Port Road (Plant and Cold room)

    09 July 2007

  • Temporary Occupation Permit (TOP) Acquired
    Lot 2525A & 2901x mk 6 at 37 Jurong Port Road

    19 July 2007

  • JHB obtain BCA grade B2 CW01 General Building

    July 2007

  • Entrepreneur of the Year 2007 - Ms. Annie Gan

    October 2007

  • Wins Enterprise 50 Award
    Position 8

    November 2007

  • Temporary Occupation Permit (TOP) Acquired
    Lot 2901 & 2525A mk6 (Top Cover) at Jurong Port Road

    05 November 2007

  • Temporary Occupation Permit (TOP) Acquired
    Lot 6814 & 6821 mk 28 at Upper Changi Road / Bedok North Ave

    28 December 2007

  • JHB upgraded to BCA grade A2 CW01 General Building

    December 2007

  • Obtain Certificate of Investment for JH Builders Vietnam Co. Pte Ltd (JHBV)

    December 2007

2006

  • Wins Enterprise 50 Award Position 22

    November 2006

  • Temporary Occupation Permit (TOP)
    Acquired Lot 8814 mk27 at Changi South Lane

    29 November 2006

  • JHB & JHP obtain ISO 9001:2000 certification

    December 2006

  • JHB & JHP obtain ISO 14001:2004 certification

    December 2006

  • JHB & JHP obtain OHSAS 18001:1999 certification

    December 2006

  • JHB & JHP obtain OHSAS 18001:1999 certification

    December 2006

  • JHP obtain BCA grade B2 CW01 General Building

    December 2006

2005

  • JHC obtains ISO 14001:1996 Certification

    April 2002

  • JHC obtains OHSAS 18001:1999 Certification

    April 2002

2002

  • JHC wins its first Design-and-Build Contract

    April 2002

  • JHC obtains ISO 9001:2000 Certification

    June 2002

1999

  • JHC Obtained CIDB Grade G2 CW01 Civil Engineering

    November 1999

1998

  • JHC Obtained CIDB Grade G2 CW01 General Building

    January 1998

1996

  • Inception of Jian Huang Group

    February 1996

  • Incorporation of Jian Huang Construction Co Pte Ltd (JHC)

    June 1996