Construction for Jurong Hill MRT Station (JS11)and Jurong Pier MRT Station (JS12). Design and construct of two Jurong Region Line stations, Jurong Hill MRT Station (JS11) and Jurong Pier MRT Station (JS12), was awarded to China Civil Engineering Construction Corporation (Singapore Branch) (CCECC) – SCB Building Construction Pte Ltd Joint Venture. Valued at a cost of around $263 million, it also includes the construction of a 1.1km viaduct between the two stations along Jurong Pier Road.
For More information:
- LTA.gov.sg: Two Civil Contracts to Construct Four Stations for the Jurong Region Line Awarded (06 April 2021)
- Straits Times: Work on 4 MRT stations serving NTU, Jurong industrial area to start by June, contracts worth $526m awarded (06 April 2021)
- Zaobao: Construction of four MRT stations on the Jurong Regional Line connecting NTU and Jurong Industrial Park begins in the second quarter | 衔接南大和裕廊工业区 裕廊区域线四地铁站第二季动工 (07 April 2021)
Project details
Design and construct for two Jurong Region Line (JRL) stations.